I was able to get a few days to work on my garage and made a ton of progress. It took me two days (working a few hours during naptime) to get the big wall framed up. I'm not a contractor, so I'm just learning it all as I go.
Once the walls were framed, I was able to get the OSB up pretty quickly. I still had to figure out how to frame up and tie it into the upper section. I finally came up with a plan and made it happen.
I got the OSB installed just in time for the snow! So glad that I pushed as hard as I did the last few weekends and during the few days I had off around Thanksgiving!
Then finally yesterday I was able to get the flashing installed and the big wall wrapped up. What a relief! I need about another hour and I can get that last section filled in with OSB and it will be 100% sealed up. I know that if I don't seal that up now, I'll have birds making nests somewhere. With the cold and snow, I'm loosing motivation pretty quickly.
The only thing left that I want to do to the building this year is add some wiring for lights and get the back garage door functional. It's so dark now that it's all enclosed. I already have lights on the side that I just enclosed, but they need to be re-wired to a light switch I'm going to install by the pedestrian door. I also want to add two additional lights and want them to all come on with one switch.
That's likely the last update until spring. I'd like to get the side I just enclosed sided to match the front, and then the back wall be board and batten. That way I can add hooks and hangers to get my ladders and other big tools out of the garage.
Cheers,
Ryan